How Much Do Building Permits Cost? Permit Fees by City

Building permit fees can range from a modest fixed charge to several thousand dollars. The amount depends on the city or other permitting authority, the project, its valuation, the fee method, plan review, inspections, and additional charges. This guide explains how permit fees are actually calculated and how to find the number that applies to your property.

Research-Based
2026 fee research
Reviewed September 2026
Quick answer

How much do building permits cost?

There is no single nationwide permit price. Current 2026 consumer data from Angi reports an average building permit cost of $1,688, with most projects between $525 and $3,114. It also reports simple permits around $150 and complex projects reaching about $8,500. These are consumer planning benchmarks, not government fee quotes.

Your actual fee can be very different. The local authority may calculate the charge from project valuation, square footage, project type, occupancy, a fixed fee, or a combination. Plan review, inspections, technology charges, zoning, development, impact, or trade permits may also be separate.

Before you calculate

What determines your exact permit cost?

The exact amount is normally a combination of the property, the work being proposed, the local fee method, and any charges that sit alongside the main building permit.

1. Property jurisdiction

The city, county, township, village, or other authority responsible for the property determines which fee schedule applies.

2. Project type

A deck, garage, roof, remodel, addition, shed, electrical project, or new construction can fall under different permit categories.

3. Valuation or size

Some jurisdictions use project valuation, square footage, occupancy, construction type, fixture counts, or another measurable input.

4. Required permit categories

Electrical, plumbing, mechanical, zoning, structural, development, or other approvals can add separate charges.

5. Plan review and inspections

Some fee schedules include these services while others charge plan review, inspection, reinspection, or related services separately.

6. Local surcharges and additional charges

Technology fees, state surcharges, development charges, impact fees, expedited review, or other local charges can increase the final amount.

Start with the facts

Six factors that can change your permit bill

The word “permit” does not tell you enough to predict the fee. The project and property determine which part of the local fee system applies.

1

Jurisdiction

The authority serving the property controls the applicable fee schedule. A project that costs one amount in one city can use a completely different formula elsewhere.

2

Project scope

Replacing a roof is not the same permitting question as rebuilding its structure, adding a skylight, or changing the building underneath it.

3

Valuation or size

Valuation-based schedules may increase as the project value rises. Other systems use square footage, occupancy, fixtures, or fixed project fees.

4

Permit categories

A project may involve building, electrical, plumbing, mechanical, structural, zoning, development, or other approvals.

5

Review and inspection

Plan review and inspection charges can be built into the main permit or listed as separate fees depending on the jurisdiction.

6

Additional charges

Technology fees, surcharges, development charges, impact fees, expedited review, and other local charges may be added.

Research-Based

Permit cost is a local calculation

The useful question is not simply “How much do permits cost?” It is “Which authority applies to this property, which permit category fits this work, and how does that authority calculate the fee?”

What is a building permit fee?

A building permit fee is a charge associated with the review and issuance of approval for regulated construction work. Depending on the property, the authority may be a city, county, township, village, or another government office responsible for construction permits.

The important distinction is between the building permit fee and the total cost of permitting a project. A project can involve plan review, inspections, electrical or plumbing permits, zoning review, technology charges, development fees, impact fees, or other charges. Those costs may not appear under one line called “building permit.”

The key rule: use national cost data only as a planning benchmark. Use the current fee schedule of the authority serving the property to determine what you should actually budget.

How much do building permits cost by project?

Project type matters because different work can fall under different permit categories and review requirements. Current 2026 consumer benchmarks from Angi provide a useful starting point, but these numbers are not municipal fee schedules.

Project or permit type 2026 consumer benchmark What can change the amount
General construction $150–$2,000 Project value, size, permit category, review level, and local fee method.
Roofing $250–$500 Scope, roof classification, inspections, and local requirements.
Garage or basement conversion $1,200–$2,000 Structural changes and multiple trade or review requirements.
Electrical $10–$500 Electrical scope, equipment, service work, and local trade fees.
Plumbing $50–$500 Fixtures, system changes, project scope, and local plumbing fees.
HVAC $250–$400 Equipment, project type, mechanical review, and local requirements.
Demolition About $200 Structure, location, environmental review, and demolition rules.
Window permit About $50 per window Number of openings, structural changes, historic review, and local rules.

These figures are consumer planning benchmarks reported by Angi in 2026. They should not be treated as government fee quotes. The local authority's current schedule controls the actual charge.

Permit cost by project: deck, garage, shed, fence, remodel and more

Searchers often want a price for a specific project rather than a general building permit. The same rule applies: project type helps identify the likely permit category, but the local fee schedule determines the actual cost.

Deck

Deck permits can depend on deck size, height, structural details, stairs, railings, footings, and local zoning or setback rules. For related requirements, see the Deck Permit Guide.

Garage

Garage permit costs can reflect building area, valuation, foundation, electrical work, zoning review, and other approvals. A detached garage can also have separate site or accessory-structure requirements.

Shed

A shed may have a fixed permit fee or may be exempt below a local size threshold. Size, height, foundation, location, and setbacks can affect both the permit requirement and the fee.

Fence

Fence permits are often governed by height, location, materials, corner visibility, easements, and zoning rules. Some jurisdictions use a fixed fee while others calculate charges differently.

Bathroom remodel

A bathroom remodel can involve building, plumbing, electrical, and mechanical work. Moving walls, plumbing lines, or electrical circuits can make the permit path more involved than a cosmetic update.

Kitchen remodel

Kitchen projects can require several permit categories when electrical, plumbing, structural, ventilation, or layout changes are involved.

Home addition

Additions are usually more involved because they can affect building area, structure, foundation, zoning, setbacks, utilities, and multiple permit categories.

Roof

Roofing permit fees can depend on whether the work is a repair, reroofing, replacement, structural repair, or part of a larger project.

Electrical

Electrical permits may use their own fee schedule. Service upgrades, circuits, equipment, fixtures, and project valuation can affect the fee.

Plumbing

Plumbing work can have separate permit and inspection charges based on fixtures, system changes, project scope, or the local plumbing schedule.

How do cities calculate building permit fees?

There is no single national calculation. Current municipal fee systems show several common approaches. Understanding the method used by your authority is more useful than relying on an average from another city.

Method 01

Project valuation

The permit fee increases according to a valuation schedule. The authority may use declared project value, standard valuation tables, or another locally adopted method.

Method 02

Square footage or project data

Some schedules use building area, occupancy, construction type, fixture counts, or another measurable project characteristic.

Method 03

Fixed or layered fees

A permit may have a fixed or minimum charge followed by separate plan review, inspection, technology, zoning, or trade charges.

Are building permit fees a percentage of construction cost?

Sometimes, but it is not safe to assume that every city charges a simple percentage of construction cost. Valuation-based systems can use stepped schedules with different rates at different valuation ranges. Other jurisdictions use fixed fees, square footage, project categories, or combinations of methods.

A better question for the permitting office is: “What valuation does your office use, and which fee schedule applies to this permit category?”

That question helps separate the contractor's construction estimate from the valuation method the authority actually uses.

Why your contractor's project price may not match the permit valuation

A contractor's estimate and a government's permit valuation are not necessarily the same number. Some authorities use standard valuation tables, minimum values, square footage, occupancy, construction type, or other prescribed methods.

Phoenix, for example, publishes a building valuation approach that can use building square footage multiplied by a standard occupancy rate for certain construction, addition, and remodeling work. Local minimum valuation rules can also apply.

The practical lesson is simple: do not deliberately understate a project to try to obtain a lower fee. Give the authority accurate information and ask how its official permit valuation is determined.

How much do building permits cost by city?

City-by-city comparison is useful because it shows how different the fee systems can be. The examples below are not intended to create a nationwide price list. They show why the same construction project can produce different permit costs in different jurisdictions.

City Current official fee approach What to check
Minneapolis, Minnesota Building permit fees are based on the valuation of the job, including labor and materials. Confirm the project valuation, permit category, current schedule, and any additional fees.
Chicago, Illinois Chicago provides a 2026 Permit Fee Calculator and states that its estimate may not include every related cost, fee, or charge. Use the official calculator, then check related charges and the exact permit category.
Austin, Texas Austin publishes development-services fee schedules and distinguishes residential plan review and permit charges. Check plan review, permit application, and any additional review or project-specific charges.
Seattle, Washington Seattle's 2026 guidance says permit cost can depend on project size, complexity, value, additional permits, review time, inspection fees, and technology fees. Identify the project valuation, required permits, review level, inspections, and technology-related charges.
Portland, Oregon Portland publishes current fee schedules and identifies a 12% Oregon state surcharge on applicable permits. Check the local schedule and the applicable state surcharge.
Milwaukee, Wisconsin Milwaukee publishes permit information and separate plan-exam and permit fee resources. Check the correct permit type and whether plan examination and permit charges are separate.
Phoenix, Arizona Phoenix publishes building valuation and development fee information, with valuation methods that can depend on occupancy and project characteristics. Check the valuation method and any separate development, zoning, impact, fire, water, or sewer charges.

What does a valuation-based permit fee look like?

Minnesota provides a useful official example of a valuation-based system. Minnesota Statutes §326B.153 sets a stepped building permit fee schedule and separately addresses plan review and required surcharges.

Under the statutory schedule, the building permit fee reaches $464.15 at a $25,000 valuation, $764.15 at $50,000, and $1,186.65 at $100,000 before considering other applicable charges. These figures demonstrate how a valuation-based schedule can increase in brackets rather than operate as one simple percentage.

Example valuation Statutory building permit fee Important limitation
$25,000 $464.15 Base statutory building permit fee before other applicable charges.
$50,000 $764.15 Other required charges can still apply.
$100,000 $1,186.65 Plan review and required surcharge provisions are separate.

This is an example of how an official fee schedule works, not a prediction of what every city charges. A different authority may use a completely different method.

Do permit fees include plan review and inspections?

Not always. Some authorities include certain review and inspection services within the main permit fee. Others publish separate plan review, inspection, reinspection, technology, or application charges.

Seattle's current guidance explicitly identifies review time, inspections, and technology fees as factors that can affect permit cost. Austin's residential guidance distinguishes plan review and permit charges. Chicago's official 2026 calculator also warns that its estimate may not include every related cost.

Before applying, ask: “Is this the complete permitting amount, or will plan review, inspections, trade permits, zoning, technology, or other charges be billed separately?”

What can make a permit more expensive than expected?

  • The scope expands. A basic repair becomes structural work, an addition, conversion, or major remodel.
  • Multiple trades are involved. Electrical, plumbing, mechanical, or other permits may be added.
  • More review is required. Structural drawings, calculations, site changes, or technical documents can increase review requirements.
  • Inspections are separate. Some jurisdictions charge for particular inspection or reinspection services.
  • Zoning or development review is required. A project can require approvals beyond the basic building permit.
  • The fee schedule has changed. An old contractor estimate or online article may use a previous year's schedule.

How much does a home remodeling permit cost?

There is no single remodeling permit price. “Remodeling” can describe anything from a cosmetic update to a structural renovation involving several permit categories.

Removing a wall, changing the building footprint, moving plumbing, upgrading electrical service, changing mechanical systems, finishing a basement, or adding living space can create a more involved permit path than painting, flooring, or other work that may be exempt under local rules.

For a broader overview, see the Permitrust Remodeling Permit Guide .

What if construction starts without the required permit?

Starting construction before obtaining a required permit is not a reliable way to save money. The consequences depend on local law and can include additional fees, inspections, correction work, stop-work requirements, or other enforcement.

Minneapolis specifically states that beginning construction before obtaining a required permit can result in doubled fees and may require some or all work to be demolished so officials can check code compliance.

If you are researching existing construction, Permitrust's guide to unpermitted work explains why permit status can matter when planning a property project.

Why permit history can matter when estimating future costs

A property's previous permits can provide useful context before you plan new work. Older additions, remodels, conversions, decks, garages, or other projects may affect what you need to understand about the property today.

If you are buying a property or planning another major project, a permit history by address search can help you understand which construction records may exist for the property.

Permit history does not replace a current project review. A previous permit does not automatically mean that a new project follows the same requirements.

How to find the exact permit fee for your property

The most reliable process is address-first research. Start with the property, identify the authority, describe the complete project, and then connect that project to the correct permit category and fee schedule.

  1. Start with the property address. Confirm the city, county, township, or other authority that handles permits.
  2. Describe the complete scope. Do not reduce a major remodel to “repair” if structural, electrical, plumbing, mechanical, or other work is also planned.
  3. Identify the permit categories. Ask whether building, electrical, plumbing, mechanical, zoning, structural, or other approvals are required.
  4. Ask how valuation is calculated. Find out whether the authority uses project value, a standard valuation, square footage, a fixed fee, or another formula.
  5. Check the current fee schedule. Confirm the schedule's effective date rather than relying on an older article or contractor estimate.
  6. Check additional charges. Ask about plan review, inspections, technology fees, surcharges, development charges, impact fees, and trade permits.
  7. Use an official calculator when available. A city calculator can make the estimate easier, but check its limitations and related charges.

Five questions to ask the permitting office

  1. Which department or authority handles permits for this property address?
  2. Which permit categories apply to the complete scope of work?
  3. How does your office calculate the permit valuation or fee?
  4. Are plan review, inspections, surcharges, technology fees, or trade permits separate?
  5. Which fee schedule is current, and when did it take effect?

Building permit cost checklist

Have these details ready before you try to calculate the fee:

  • Property address
  • City, county, township, or other jurisdiction if known
  • Project type
  • Plain-English scope of work
  • Approximate project valuation
  • Square footage or dimensions where relevant
  • New construction, existing structure, addition, alteration, or conversion
  • Structural changes
  • Electrical, plumbing, mechanical, or other related work
  • Drawings or plans required by the authority
  • Current fee schedule or official calculator
  • Questions about plan review, inspections, and additional charges

Use a permit cost calculator carefully

A calculator can be useful when you need an early planning estimate. It can help you understand how project value or other inputs may affect a fee.

Permitrust's Building Permit Cost Calculator can help with early planning. It should not be treated as a substitute for the current fee schedule of the authority serving your property.

The most reliable workflow is: estimate first, verify locally second.

What should you budget for a building permit?

For planning purposes, many ordinary residential permits are measured in hundreds of dollars, while larger or more complicated projects can move into the thousands. Current consumer benchmarks support that broad range, but official city fee schedules show why it cannot be converted into one national price.

A small project using a fixed-fee schedule may have a relatively modest permit charge. A large remodel, addition, new construction project, garage conversion, or multi-trade project can involve a larger base fee plus plan review, inspections, and other approvals.

The practical rule is: use national cost data to understand the scale of the expense, then use the local authority's current fee schedule to build your actual budget.

Why city-specific permit research matters

Searching “building permit cost” gives you useful general information, but the number you need is usually tied to a property address. Two homes with similar projects can have different fees because they fall under different jurisdictions or different fee schedules.

The same city can also have different permit costs for different projects. A deck, fence, garage, roof, bathroom remodel, kitchen remodel, and home addition do not necessarily use the same permit category or calculation.

That is why the strongest permit research path is:

Property Address → Jurisdiction → Project → Permit Type → Fee Method → Additional Charges

Moving from a general estimate to property-specific research

A general article can explain how permit fees work. It cannot replace the connection between a specific property, project scope, and local fee schedule.

Permitrust is designed to help homeowners and contractors research permit questions around a property address and project. It is not a government agency, does not approve permits, and does not replace the applicable local authority.

When you need to move from “How much do permits cost?” to “What should I expect for my property and project?”, start with the address and the complete scope of work.

Ready to research?

Check permit costs and requirements for your address

Start with the property and complete project scope, then verify the final fees and requirements with the local authority.

Check My Address
Research-Based

Sources & 2026 Fee References

Permit fees are local and can change. This guide separates official municipal and state fee information from consumer cost benchmarks so that planning estimates are not confused with government charges.

The sources below were reviewed for this guide in September 2026. Always confirm the current fee schedule and effective date with the authority serving your property.

Official Government Sources

Consumer Cost Benchmark

Related Permitrust resources

Need more than a general cost estimate?

Move from general permit pricing to project, property, application, and record research.

Common questions

Building permit cost questions homeowners ask

Straight answers about permit fees, city differences, project costs, and finding the exact amount for a property.

How much do building permits cost?

There is no single national price. Current consumer benchmarks can put many ordinary permits in the hundreds or low thousands of dollars, but the actual fee depends on the local authority, project type, valuation, fee method, plan review, inspections, and additional charges.

Is a building permit fee based on construction cost?

Sometimes. Some jurisdictions use project valuation, while others use square footage, project type, fixed fees, occupancy, or a combination of methods. The local fee schedule determines which calculation applies.

Do permit fees include plan review and inspections?

Not always. Some jurisdictions include certain review or inspection services in the main permit charge, while others list plan review, inspections, technology charges, or other fees separately.

Why do permit fees vary by city?

Permit fees vary by city because each authority can adopt its own fee schedule, valuation method, permit categories, review charges, inspection structure, surcharges, and additional approval requirements.

How much does a remodeling permit cost?

There is no standard remodeling permit price. A cosmetic project may have little or no building-permit cost in some jurisdictions, while structural remodeling, additions, and projects involving electrical, plumbing, or mechanical work can require multiple permits and additional fees.

How can I find the exact permit fee for my property?

Start with the property address and complete project scope, identify the authority having jurisdiction, then use its current fee schedule or official calculator. Confirm whether plan review, inspections, trade permits, and other charges are separate.

Start with the right local information

Check permit costs and requirements for your property

Move from a general permit estimate to address-specific research, then confirm the final fees and requirements with the local authority.